Our process

How We Prepare Your Plumbing Estimate

A straightforward, document-driven process — no site visits, no guesswork. From drawing submission to final deliverable in 3–5 business days.

01

Submit Your Project Drawings

Send us your construction documents via our quote request form or email. We accept PDF, DWG, Revit, and most common formats. Include any addenda, specifications, or scope clarifications you have.

  • Architectural and plumbing drawings (PDF or CAD)
  • Project specifications or scope of work
  • Addenda and RFI responses if available
  • Preferred bid date or turnaround deadline
02

We Review & Confirm Scope

Our estimators review your documents and confirm the scope before work begins. If drawings are incomplete or we need clarification, we reach out promptly — we do not make assumptions that inflate or deflate your number.

  • Drawing completeness check
  • Scope boundary confirmation
  • Clarification requests sent within 24 hours
  • Turnaround timeline confirmed
03

Quantity Takeoff & Material Pricing

We perform a detailed digital takeoff of all plumbing systems shown in the drawings. Pipe footage, fittings, fixtures, valves, hangers, and specialty equipment are counted and measured from the plans.

  • Digital plan takeoff (not manual scaling)
  • Pipe footage measured by system and size
  • Fittings and valves counted per drawing
  • Fixtures and equipment listed by specification
04

Material Pricing Applied

Material pricing is sourced from current supplier and vendor quotes wherever possible. Where live quotes are not available, we apply clearly labelled allowances based on recent market data — you always know which line items carry an allowance versus a firm price.

  • Supplier and vendor quotes used where available
  • Allowances clearly labelled — never hidden
  • Pricing reflects current market conditions
  • No markup applied — you receive cost-level pricing
05

Labour & Overhead (If Requested)

Labour units can be added as an optional component. We apply productivity rates appropriate to the project type and region. Overhead and profit are not included by default — you apply your own margins to the base cost.

  • Labour hours by trade and task
  • Productivity rates by project type
  • Prevailing wage rates applied where applicable
  • Overhead and profit excluded — you add your own
06

Deliverable Sent to You

Your completed estimate is delivered by email as an Excel spreadsheet with a PDF summary. The file is organised by CSI division and system type so you can review, adjust, or present it directly.

  • Excel spreadsheet — fully editable
  • PDF summary for quick review
  • Organised by system and CSI division
  • Basis of estimate notes included

What You Receive

Every estimate includes the same core deliverable package — no hidden extras.

Itemised Estimate Spreadsheet

Line-by-line breakdown of materials, quantities, unit costs, and extended totals. Organised by system type and CSI division. Fully editable in Excel.

Scope Summary

A written summary of what is included and excluded in the estimate. Identifies any assumptions made and flags items that require further clarification or specification.

Basis of Estimate Notes

Documents the pricing methodology used — which line items carry supplier quotes, which carry allowances, and the source of any labour productivity rates applied.

Turnaround Times

3–5 business days

Standard turnaround for most residential and commercial projects

1–2 business days

Rush service available for urgent bid deadlines — contact us to confirm availability

Turnaround begins once all required drawings and scope documents are received and confirmed.

Pricing Methodology

We do not apply a single national average to your project. Material pricing is sourced from current supplier quotes, distributor pricing, and recent project data relevant to your region and project type. Where a live quote is not available, we apply an allowance — and we label it clearly so you know exactly where the uncertainty sits. Labour rates reflect current union and open-shop productivity data for the applicable trade and region, including prevailing wage schedules where required.

Ready to Get Started?

Submit your drawings and we'll confirm scope and turnaround within one business day.